|
Wednesday - June 13th |
Thursday - June 14th |
| 2012
|
Track 1 |
Track 2 |
Track 1 |
Track 2 |
| 7:00-8:00 |
Check-in and Registration (coffee and pastries
served) |
Check-in and
Registration (coffee and pastries served) |
| 8:00-8:30 |
T1-S5 Integrated Reliability Improvement Framework for an
Enterprise
Girish S. Kshirsagar BE
Aerospace, Inc.
|
T2-S5
Application of General Electric's Design for Reliability (DFR) 10-Step Process for Healthcare Equipment
Robert A. Belinski General Electric Healthcare
|
| 8:30-9:00 |
Welcome (in
Track 1 Room) |
| 9:00-9:10 |
10 Minute Break |
| 9:10-10:10 |
T1-S1
The Problem with Probability
Elizabeth Lay Siemens Energy
|
T2-S1 Reliability Simulation of an Expandable Liner Hanger
Ganesh Nanaware Baker Hughes
|
T1-S6
Pitfalls in Conducting and Interpreting the Results of an Accelerated Test
Georgios Sarakakis Tesla Motors
|
T2-S6 ATIRCM Lessons Learned – Implementation of a Successful FRACAS Program
Craig Shevlin BAE Systems
|
| 10:10-10:30 |
20 Minute Break |
| 10:30-11:30 |
T1-S2
Reenergizing R&M Engineering in the Department of the
Navy
James Woodford Department of the Navy
|
T2-S2
Benchmarking Your Reliability Program: Are You Just Doing Things Right or Doing the Right Things?
Stan Stephenson Halliburton
|
T1-S7
Strategic Implementation of Reliability Management: Its
Impact on Industrial Lift Trucks
Harold (Bud)
Johnson NACCO Materials Handling Group (NMHG)
|
T2-S7
The Transition from MTTF Reliability Predictions to Physics of Failure Reliability Assessments
James McLeish DfR Solutions
|
| 11:30-1:00 |
1 Hour 30 Minute Lunch Break
|
| 1:00-2:00 |
T1-S3 Using Reliability
Tools to Improve a Business' Bottom Line
Aron Brall NASA Goddard
Space Flight Center
|
T2-S3
Successful Implementation of Design for Reliability and Execution of
Reliability Growth Testing on the Expeditionary Fighting
Vehicle
Matthew Morningstar United States Marine Corps
|
T1-S8 Developing an Effective RPP and Required Reliability Analyses During EMD
Phase
Muhammad S.
Anwar Naval Air Warfare Center Weapons Division (NAWCWD)
|
T2-S8
Effectively Analyzing and Communicating Testing Data
Harland MacKenzie Dana Power Technology Group
|
| 2:00-2:20 |
20 Minute Break |
| 2:20-3:20 |
T1-S4 Reliability Growth
Program for 3D Printers – Lessons Learned
Daniel Yin Stratasys Inc.
|
T2-S4
DFR ROI: Calculating ROI When Implementing a DFR Program
Mike Silverman Ops A La Carte
|
T1-S9
Avoiding Common Reliability Mistakes
Andrew Foote Alion Science and Technology Corporation |
T2-S9
Test Laboratory Management: The Glue That Binds Reliability Together
G. Michael Smith Magna Powertrain NA
|
| 3:20-3:30 |
10 Minute Break |
| 3:30-4:30 |
T1-T1
Application Lessons for Effective FMEAs
Carl
S. Carlson ReliaSoft Corporation |
T1-S10 The Role of
Function Analysis in Design for Reliability and Design for Six Sigma
Mohammad Hijawi Chrysler Group LLC
|
T2-S10 ANSI/GEIA-STD-0009 within the
Engineering Development & Support Process
Andrew J.
Miller Northrop Grumman
|
| 4:30-5:00 |
|
|
| |
|
|
| 5:30-6:30 |
Welcome Reception
(in the Orleans/Rosalie rooms) |
|
| 6:30-9:00 |
|
Hosted Dinner (from 6:00 to 9:00)
(in the Ile de France Grand Ballroom)
Keynote Address
Driving Product Reliability and Service Quality in the Oil Services
Industry
Randolph G. Phillips
Baker Hughes
|