2011 ARS, Europe
Program of Presentations and Tutorials
This matrix presents the program of the presentations, tutorials and
other events planned for the 2011 International Applied Reliability Symposium,
Europe. A
print-ready brochure (*.pdf, 1650 KB)
also is available.
| |
 |
Wednesday - March 23 |
Thursday - March 24 |
|
2011
|
Track 1 |
Track 2 |
Track 1 |
Track 2 |
| 7:00-8:30 |
Registration |
|
| 8:30-9:00 |
Welcome
(in Track 1
Room) |
| 9:00-9:10 |
10 Minute
Break |
| 9:10-10:10 |
T1-S1
Facilitation Skills for FMEA Leaders
David J. Auda QuEST Global Inc, GE Energy
|
T2-S1
Reliability: Is It a Blessing or a Curse?
John van Schendel Relia-Easy |
T1-S5
Reliability Analysis and RBI Planning for Industrial Vessels
Andrzej Kozak UDT |
T2-S5
Tools to Capture Customer Needs
Melvin Brinkman Sensata Technologies
|
| 10:10-10:30 |
20 Minute
Break |
| 10:30-11:30 |
T1-S2
"Real-Time" FMECA: Using Xfmea to Manage Technical Risk in
the Oil & Gas Industry
Chris Davis
GE Oil & Gas |
T2-S2
Mismanaging RAMS: L3 or Lost Lessons Learned
Jean-Marie Pierre Cloarec Bombardier Transportation |
T1-S6
Reliability Engineering Inside
Jasper
Lipsch Mainnovation |
T2-S6
Reliability Process Management (RPM): RPM Review for Complex Systems
James Bartos International TechneGroup Incorporated
|
| 11:30-1:00 |
1 Hour
30 Minute Lunch Break |
| 1:00-2:00 |
T1-S3
Effective Reliability Engineering Management
Emek Akgezer Turkish Aerospace Industries, Inc.
|
T2-S3
Product Development Under Consideration of Component Obsolescence
and Reliability Risks
Stephen May Cameron |
T1-S7
Recurrent Event Analysis: How to Detect Failed Maintenance Actions
Among Failure Events Based on Data Exploration Experience
Marek Mikołajewski GE Oil & Gas
|
T2-S7
Practical Reliability Testing of Structures under Road
Loadings
Julio Pulido
Ingersoll Rand |
| 2:00-2:20 |
20 Minute
Break |
| 2:20-3:20 |
T1-S4
The Optimum Replacement Time Considering Reliability Growth, Life Cycle
and Operational Costs
Eduardo Calixto Petrobras |
T2-S4
Prediction Methods for Extremely Long Life, One-Shot, Non-Reparable
Lighting Systems
Dr. Géza Szeghy GE Lighting
|
T1-S8
Preventive Maintenance: Using Industrial RCM to Set Up Preventive
Maintenance in a Glass Manufacturing Plant
Loek Willenborg
Scheuten Glass |
T2-S8
Increasing Mandrel Life in Cold Ring Rolling Process: An Application of
DOE Principles to Reliability Analysis
Tayfun Kocabas
S.P.A.C. Consulting |
| 3:20-3:30 |
10 Minute
Break |
| 3:30-5:00 |
T1-T1 Asset Management Supported by Reliability
Engineering
Claudio Caiani Spano
ReliaSoft Brasil |
T2-T1 Essential Elements and Activities for a
Successful Reliability Program
Pantelis Vassiliou
ReliaSoft Corporation |
T1-T2 Practical Approach to RCM for Setting Up
Maintenance for Your Plant
Martin van den Hout Egemin Consulting |
T2-T2 Applying DOE in Accelerated Test Planning
Adamantios Mettas ReliaSoft Corporation |
| 5:00-6:00 |
|
|
|
|
| 6:00-9:00 |
|
|
Reception
|
|
 |
Friday - March 25
|
| |
Track 1 |
Track 2 |
| 7:30-8:00 |
Attendance Certificates
Issued |
| 8:00-9:00 |
T1-S9
Field Failure Analysis – An Important Step in Reducing
Maintenance Costs
Amnon Ganot Gertron Ltd. |
T2-S9
Ten Things You Should Know About HALT & HASS
Albertyn Barnard Lambda Consulting |
| 9:00-9:10 |
10 Minute
Break |
| 9:10-10:10 |
T1-S10
How Can Machine Tool and Plant Manufacturers Increase the Trustability
of the Needed Reliability Figures?
Dominic Appel
Karlsruhe Institute of Technology |
T2-S10
Advanced Reliability Analysis of Warranty Databases (RAW)
Concept
Stefan Bracke University of Wuppertal |
| 10:10-10:20 |
10 Minute
Break |
| 10:20-11:20 |
T1-S11
Reliability of Voltage-Source Converters: Reliability Standards,
Aging Components and Load-Sharing Redundancy
Gernot J. Riedel ABB Switzerland |
T2-S11
Component Life and Reliability Optimization of the Supply System for
Mobile Refrigeration and A/C Units
Václav Verner Ingersoll Rand Equipment
Manufacturing Czech Republic s.r.o. |
|
11:20-11:30 |
10 Minute
Break |
| 11:30-12:00 |
Excellent Presentation
Awards |
|
|
Continuing Education Credit:
1.4 CEUs and 1 CRP Credit